For years we have been following and cooperating with various Professionals,
Fitters, Builders, Layers, Principal, and Final Clients in assisting them with their
works and choices.
From every one of them we have been able to learn something that today
allows us to have a broader view of the entire construction industry, from planning
to maintenance, to the selection of finishing, and this gives us today the chance to
place this know-how at disposal of others.
In the building field as in other sectors where the complexity and quantity
of Players involved are many, we can identify the "weak links" in the chain which, if
not recognized and "strengthened" promptly, these spring-up later as problems (delays,
objections, additional costs, dissatisfaction, etc.).
In addition to experiences matured on the field, another essential resource
from which we draw knowledge are all those information events, where the laws, rather
than technological stratagems or delving in technical-practical subjects, are analyzed,
still pertaining the field of building and real estate.
Not least the choice of considering the various construction "ratings"
currently being utilized in the world, such as for example, ITACA, SB100, CasaClima,
BREEAM, Green Building Challenge, LEED, etc., which have allowed us to understand that,
in the future those who will build according to "Green & Smart", will be the winners,
so, it is not sufficient anymore being a good Designer or a good Builder, but we must
work as a Team to produce the healthiest and most comfortable for man and just as much
less burdening on the environment (materials, consumptions, recyclability of the
components, lighting, replacement and quality of internal air, correct use of waters,
handicapped, etc).
When we undertake a new task, either commissioned by the Designer rather
than by the Principal, we try first of all to understand what are the actual
expectations of the Principal; we start by personally working in close contact with
the Designer and later with the various Players involved, so that they may be
accomplished, if not exceeded, without increasing the final cost (including our
remuneration).
To achieve this we utilize CAD systems (MacPro Quad and ArchiCAD)
capable of supplying the utmost readability of the projects even to unskilled
subjects, through the photorealist rendering rather then short footages.
Once having decided the base configuration, we can create alternatives
and view them, modify their various options, from walls' colors to that of the
furniture, from the positioning of lights to the various types of finishing, so
that we can supply to the trusted furniture maker, to the decorator, system'
installer, layer or carpenter, all the details needed to achieve the "dream for
every day life."
Here we can see an example of how a wall kitchen has been studied,
planned and then built, integrated with lighting, all starting from the
planimetry.
After delivering the plans to the various artisans, we can follow
along with them the various stages of production and hand-over everything
complete, checked in every component, clean and ready to be enjoyed or
utilized.
Our business philosophy is based on Customer Satisfaction achieved
through Team work (Designers, Installers, Builders, Decorators, etc.), so, it
is of the utmost importance that the Client be the center of our attentions.
Our role is to be the "interpreters" between the various players and
the Client, with the objective of achieving complete satisfaction, if not
altogether exceed Client's expectations.
It is important to furnish a high-performing building, and perhaps
even certify it, but it is just as important to study in advance the objects
making it up, lights, furniture, colors and materials, so that the Client can
first hand and virtually, be aware of his/her choices.
Team work is extremely important because it allows to express at best
the skills and professionalisms of everyone, and our role wishes to be
interpretation and translation of all these elements before the Principal; the
resulting products will be a certified building, but also a building studied
in the least details, thus and additional "added value."
Following we'll show how the elimination of switches in a bedroom
has been achieved through radio-transmitting buttons and all without modifying
the existing electric system and above all without masonry works.
We offer a complete service of specific consultancy and targeted
training for the sector, dedicated to those who wish to undertake or become
qualified in this activity; the only prerequisite to access such services is
to be in good standings with the National contribution system (Employees of
Companies in the industry, Entrepreneurs or Self-employed Professionals).
After completing the cooperation with the Team, we'll all have
been able to expand our know-how and face new challenges "with two additional
eyes."